Loading...

Texas Solar Permit Design & Engineering

Select a complete solar plan-set, engineering, city permitting, or utility interconnection service for your Texas project.

Permit Design
Up to 12 kW
$125.00

Ideal for standard residential rooftop solar installations.

  • 24-48 hr delivery
Permit Design
12 to 25 kW
$200.00

Best suited for large residential or multi-array setups.

  • 24-48 hr delivery
Permit Design
Over 25 kW
$300.00

Comprehensive packages for high-capacity residential systems.

  • 24-48 hr delivery

Residential Stamps Category
Structural Stamp
Up to 15 kW
$175.00

Residential structural engineering stamp.

  • Restamp fee: $25
  • 24-48 hr delivery
Structural Stamp
Over 15 kW
$300.00

Residential structural engineering stamp.

  • Restamp fee: $25
  • 24-48 hr delivery
Electrical Stamp
Up to 15 kW
$175.00

Residential electrical engineering stamp.

  • Restamp fee: $25
  • 24-48 hr delivery
Electrical Stamp
Over 15 kW
$300.00

Large residential electrical engineering stamp.

  • Restamp fee: $25
  • 24-48 hr delivery

City Permits & Interconnection Category
City Permit
Up to 10 kW
$250.00

City permit application.

  • City fees not included
City Permit
Over 10 kW
$350.00

City permit application.

  • City fees not included
PTO / NEM
Up to 10 kW
$250.00

PTO / NEM interconnection application.

  • NEM fees not included
PTO / NEM
Over 10 kW
$350.00

PTO / NEM interconnection application.

  • NEM fees not included
Texas Permit Expertise

Solar Plans Prepared for Texas AHJs & Utilities

Texas requirements can vary by city, county, utility territory, and property location. We tailor each submission instead of relying on a one-size-fits-all drawing set.

Our team coordinates electrical design, structural details, equipment documentation, and interconnection information so installers receive a clear, buildable permit package.

City and county submittals
Site-specific wind criteria
Utility-ready diagrams
Plan-check revision support

Statewide Project Support

Residential and commercial solar drafting support for projects across Texas, including utility and local jurisdiction requirements.

Texas Plan-Set Scope

Everything Needed for a Clear Submission

Site & Roof Plans

Array placement, setbacks, attachment layout, roof information, equipment locations, and required labels.

Electrical Design

Single-line diagrams, conductor and conduit sizing, calculations, disconnects, and interconnection details.

Engineering & Revisions

PE stamping when required and timely updates in response to AHJ or utility review comments.